Project Details

OWNER  |  Teel Plastics

ARCHITECT   |  Durrant Associates

SIZE  |  147,000 ft2 (34,000 ft2 office)

CATEGORY  |  Corporate, Green, Laboratory, Manufacturing/Industrial

 

Teel Plastics’ headquarters and manufacturing operations are housed in a 147,000 ft2 precast manufacturing facility. There they produce plastic products using injection molding, blow molding and pultrusion.

We started this project by performing a site analysis and moved on to programming, space planning, civil and structural engineering, architecture, site work, concrete foundations, precast envelope, masonry, structural steel, fully adhered roofing system, doors, windows, finishes, elevator, fire protection, plumbing, HVAC, electrical, and commissioning. In the end, we were happy to provide such an extensive and functional environment for the people at Teel Plastics.

Download this portfolio piece here.